Ankleshwar Jn to Bobbili Jn by train, with one change
No train runs the whole way from Ankleshwar Jn to Bobbili Jn. Changing at Surat takes 27 hr 37 min, and the quickest pairing is 19016 then 09059.
1 change · 1,132 km apart · fastest 27 hr 37 min · Daily
Check seats for your dateAnkleshwar Jn (AKV) to Bobbili Jn (VBL)Journeys and seats
- One change at SuratST11:3627 hr 37 min15:13+1 arrives the next day1 hr 8 min to change at ST — tight
Holds about 8 times in 10 here. 96 min would make it 9 in 10. Measured on 3,330 paired days.
09059 often runs late
AKV — ST
Checking seatsST — VBL
Checking seats - One change at Udhna JnUDN04:2228 hr 21 min08:43+1 arrives the next day58 min to change at UDN — comfortable
Typically 1 min late here, still leaving about 41 min to change.
19021 often runs late
AKV — UDN
Checking seatsUDN — VBL
Checking seats - One change at SuratST10:2828 hr 45 min15:13+1 arrives the next day3 hr 3 min to change at ST — comfortable
Holds about 9 times in 10 here. Measured on 6,877 paired days.
09059 often runs late
AKV — ST
Checking seatsST — VBL
Checking seats - One change at Vadodara JnBRC18:3129 hr 12 min23:43+1 arrives the next day1 hr 15 min to change at BRC — comfortable
Holds about 9 times in 10 here. Measured on 2,12,299 paired days.
22476 often runs late
AKV — BRC
Checking seatsBRC — VBL
Checking seats - One change at SuratST18:2629 hr 17 min23:43+1 arrives the next day3 hr 31 min to change at ST — comfortable
Almost always holds here. Measured on 1,73,806 paired days.
12844 often runs late
AKV — ST
Checking seatsST — VBL
Checking seats - One change at SuratST18:2629 hr 17 min23:43+1 arrives the next day3 hr 31 min to change at ST — comfortable
Almost always holds here. Measured on 1,73,806 paired days.
12844 often runs late
AKV — ST
Checking seatsST — VBL
Checking seats
Each leg is a separate ticket on its own PNR, booked separately. RAC is not a confirmed berth and a waitlist number is not a seat.
Ankleshwar Jn to Bobbili Jn by train
- Is there a direct train from Ankleshwar Jn to Bobbili Jn?
- No. No single train runs from Ankleshwar Jn to Bobbili Jn. The journey takes one change, at Surat, and the fastest combination takes 27 hr 37 min.
- What is the fastest way from Ankleshwar Jn to Bobbili Jn by train?
- 19016 SAURASHTRA EXP departs Ankleshwar Jn at 11:36 and reaches Surat at 13:12. 09059 ST BAM SPECIAL then departs at 14:20 and arrives Bobbili Jn at 15:13. Total 27 hr 37 min, with 1 hr 8 min to change.
- Where do you change trains between Ankleshwar Jn and Bobbili Jn?
- Surat (ST) is the interchange on the fastest route, with 1 hr 8 min between the arriving and departing trains.
- Which days can you travel from Ankleshwar Jn to Bobbili Jn?
- A connection is available every day of the week.
Other trains from Ankleshwar Jn
- Ankleshwar Jn to Ahmedabad Jn27 direct trains · 179 km
- Ankleshwar Jn to Anand Jn24 direct trains · 115 km
- Ankleshwar Jn to Vapi23 direct trains · 142 km
- Ankleshwar Jn to Valsad23 direct trains · 118 km
- Ankleshwar Jn to Nadiad Jn18 direct trains · 133 km
- Ankleshwar Jn to Vasai Road15 direct trains · 265 km
Other trains to Bobbili Jn
RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.
RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.