Bapatla to Rae Bareli Jn by train, with one change
No train runs the whole way from Bapatla to Rae Bareli Jn. Changing at Vijayawada Jn takes 31 hr 45 min, and the quickest pairing is 17248 then 12539.
1 change · 1,151 km apart · fastest 31 hr 45 min · Daily except Fri
Check seats for your dateBapatla (BPP) to Rae Bareli Jn (RBL)Day by day
The quickest journey with one change, for each day a connection runs.
- Monday42 hr 10 minarrives 2 days later21:30 12709 SIMHAPURI SF EX · Superfast → Kazipet Jn (KZJ) 02:3313:10 22683 YPR LKO EXP · Superfast → arrives 15:4010 hr 37 min to change at KZJ — comfortableTypically 30 min late here, still leaving about 589 min to change.12709 often runs late
- Tuesday39 hr 45 minarrives 2 days later11:00 16093 MAS LJN EXPRESS · Mail/Express → Kanpur Central (CNB) 18:2523:45 14866 MARUDHAR EXP · Mail/Express → arrives 02:455 hr 20 min to change at CNB — comfortable320 min to change, which holds about 19 times in 20 here. Measured on 3,58,170 paired days.16093 often runs late
- Wednesday31 hr 55 minarrives 2 days later23:55 12840 MAS HWH SF MAIL · Superfast → Vijayawada Jn (BZA) 01:2002:35 12539 YPR LKO EXP · Superfast → arrives 07:501 hr 15 min to change at BZA — tight75 min to change holds about 8 times in 10 here. 97 min would make it 9 in 10. Measured on 2,21,096 paired days.12840 often runs late
- Thursday31 hr 45 minarrives next day00:05 17248 DMM NS EXP · Mail/Express → Vijayawada Jn (BZA) 01:2502:35 12539 YPR LKO EXP · Superfast → arrives 07:501 hr 10 min to change at BZA — tight70 min to change holds about 8 times in 10 here. 97 min would make it 9 in 10. Measured on 2,21,096 paired days.17248 often runs late
- Saturday43 hr 25 minarrives 2 days later15:50 06085 ERS PNBE SPL · Mail/Express → Bhubaneswar (BBS) 08:4012:20 12875 NEELACHAL SF EX · Superfast → arrives 11:153 hr 40 min to change at BBS — comfortable220 min to change, which almost always holds here. Measured on 78,727 paired days.06085 often runs late
- Sunday43 hr 10 minarrives next day03:50 13352 ALLP DHN EXPRESS · Mail/Express → Dhanbad Jn (DHN) 10:5012:00 12371 HWH BKN SF EXP · Superfast → arrives 23:001 hr 10 min to change at DHN — comfortableTypically 12 min late here, still leaving about 39 min to change.12371 often runs late
Other ways to make the trip
Slower pairings, or a change at a different junction.
- Wednesday33 hrarrives 2 days later22:50 17209 SESHADRI EXP · Mail/Express → Vijayawada Jn (BZA) 00:2502:35 12539 YPR LKO EXP · Superfast → arrives 07:502 hr 10 min to change at BZA — comfortable130 min to change, which holds about 9 times in 10 here. Measured on 2,21,096 paired days.17209 often runs late
- Thursday43 hr 10 minarrives next day03:50 13352 ALLP DHN EXPRESS · Mail/Express → Dhanbad Jn (DHN) 10:5012:00 12353 HWH LKU EXPRESS · Superfast → arrives 23:001 hr 10 min to change at DHN — comfortableTypically 12 min late here, still leaving about 39 min to change.
- Thursday43 hr 58 minarrives 2 days later11:00 16031 ANDAMAN EXPRESS · Mail/Express → Bina Jn (BINA) 11:3021:05 12183 BPL MBDP SF EXP · Superfast → arrives 06:589 hr 35 min to change at BINA — comfortable575 min to change, which almost always holds here. Measured on 53,754 paired days.12183 often runs late
- Saturday43 hr 58 minarrives 2 days later11:00 16093 MAS LJN EXPRESS · Mail/Express → Bina Jn (BINA) 11:4521:05 12183 BPL MBDP SF EXP · Superfast → arrives 06:589 hr 20 min to change at BINA — comfortable560 min to change, which almost always holds here. Measured on 53,754 paired days.12183 often runs late
- Wednesday44 hr 50 minarrives 2 days later11:00 16031 ANDAMAN EXPRESS · Mail/Express → Itarsi Jn (ET) 07:2018:50 12539 YPR LKO EXP · Superfast → arrives 07:5011 hr 30 min to change at ET — comfortable690 min to change, which almost always holds here. Measured on 2,21,238 paired days.12539 often runs late
Bapatla to Rae Bareli Jn by train
- Is there a direct train from Bapatla to Rae Bareli Jn?
- No. No single train runs from Bapatla to Rae Bareli Jn. The journey takes one change, at Vijayawada Jn, and the fastest combination takes 31 hr 45 min.
- What is the fastest way from Bapatla to Rae Bareli Jn by train?
- 17248 DMM NS EXP departs Bapatla at 00:05 and reaches Vijayawada Jn at 01:25. 12539 YPR LKO EXP then departs at 02:35 and arrives Rae Bareli Jn at 07:50. Total 31 hr 45 min, with 1 hr 10 min to change.
- Where do you change trains between Bapatla and Rae Bareli Jn?
- Vijayawada Jn (BZA) is the interchange on the fastest route, with 1 hr 10 min between the arriving and departing trains.
- Which days can you travel from Bapatla to Rae Bareli Jn?
- Connections are available on Monday, Tuesday, Wednesday, Thursday, Saturday and Sunday.
Other trains from Bapatla
Other trains to Rae Bareli Jn
- Bareilly to Rae Bareli Jn21 direct trains · 313 km
- Moradabad to Rae Bareli Jn17 direct trains · 404 km
- Bhadohi to Rae Bareli Jn15 direct trains · 179 km
- Varanasi Jn to Rae Bareli Jn14 direct trains · 224 km
- Shahjehanpur to Rae Bareli Jn11 direct trains · 242 km
- Hardoi to Rae Bareli Jn11 direct trains · 180 km
Important
RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.
RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.