Skip to search

Gudur Jn to Nasik Road by train, with one change

No train runs the whole way from Gudur Jn to Nasik Road. Changing at Jalgaon Jn takes 22 hr 42 min, and the quickest pairing is 20625 then 22537.

1 change · 907 km apart · fastest 22 hr 42 min · Daily

Check seats for your dateGudur Jn (GDR) to Nasik Road (NK)

Day by day

The quickest journey with one change, for each day a connection runs.

  • Monday, Tuesday, Thursday, Friday and Sunday22 hr 42 minarrives next day
    21:45 20625 MAS BGKT SF EXP · Mail/Express Jalgaon Jn (JL) 16:47
    17:22 22537 KUSHINAGAR EXP · Superfast → arrives 20:27
    35 min to change at JL — tightTypically 13 min late here, leaving about 3 min spare. It usually works, but there is little room.20625 often runs late
  • Wednesday24 hr 28 minarrives next day
    01:15 12512 RAPTISAGAR SF EX · Superfast Balharshah (BPQ) 12:40
    13:40 22110 BPQ LTT EXPRESS · Superfast → arrives 01:43
    1 hr to change at BPQ — tightTypically 22 min late here, leaving about 19 min spare. It usually works, but there is little room.12512 often runs late
  • Saturday23 hr 25 minarrives next day
    17:40 22663 MS JU SF EXPRESS · Superfast Badnera Jn (BD) 09:35
    10:30 12860 GITANJALI EXP · Superfast → arrives 17:05
    55 min to change at BD — comfortableTypically 11 min late here, still leaving about 26 min to change.22663 often runs late

Other ways to make the trip

Slower pairings, or a change at a different junction.

  • Monday22 hr 57 minarrives next day
    21:45 20625 MAS BGKT SF EXP · Mail/Express Jalgaon Jn (JL) 16:47
    17:40 11062 JYG LTT EXP · Mail/Express → arrives 20:42
    53 min to change at JL — comfortableTypically 13 min late here, still leaving about 21 min to change.20625 often runs late
  • Saturday23 hr 33 minarrives next day
    12:05 12656 NAVJEEVAN SF EXP · Superfast Jalgaon Jn (JL) 08:22
    09:02 12162 LASHKAR SF EXP · Superfast → arrives 11:38
    40 min to change at JL — tightTypically 5 min late here, leaving about 16 min spare. It usually works, but there is little room.
  • Saturday23 hr 47 minarrives next day
    07:40 12611 NZM GARIBRATH · Rail Motor Nagpur (NGP) 20:25
    21:15 12140 SEVAGRAM EXP · Superfast → arrives 07:27
    50 min to change at NGP — tightTypically 15 min late here, leaving about 14 min spare. It usually works, but there is little room.12611 often runs late
  • Friday24 hr 22 minarrives next day
    12:05 12656 NAVJEEVAN SF EXP · Superfast Bhusaval Jn (BSL) 07:45
    09:05 12520 AGTL LTT AC EXP · Superfast → arrives 12:27
    1 hr 20 min to change at BSL — tight80 min to change holds about 9 times in 10 here. 83 min would make it 9 in 10. Measured on 1,31,374 paired days.
  • Sunday24 hr 22 minarrives next day
    12:05 12656 NAVJEEVAN SF EXP · Superfast Bhusaval Jn (BSL) 07:45
    09:05 22122 LKO LTT AC EXP · Superfast → arrives 12:27
    1 hr 20 min to change at BSL — tight80 min to change holds about 9 times in 10 here. 83 min would make it 9 in 10. Measured on 1,31,374 paired days.22122 often runs late
  • Monday24 hr 35 minarrives next day
    21:45 20625 MAS BGKT SF EXP · Mail/Express Jalgaon Jn (JL) 16:47
    17:55 11114 BHUSAVAL - DEVLALI MEMU EXPRESS · Mail/Express → arrives 22:20
    1 hr 8 min to change at JL — comfortableTypically 13 min late here, still leaving about 36 min to change.20625 often runs late
  • Wednesday25 hr 10 minarrives next day
    12:05 12656 NAVJEEVAN SF EXP · Superfast Jalgaon Jn (JL) 08:22
    09:55 15018 GKP LTT EXP · Mail/Express → arrives 13:15
    1 hr 33 min to change at JL — comfortableTypically 5 min late here, still leaving about 69 min to change.15018 often runs late
  • Wednesday25 hr 30 minarrives next day
    12:05 12656 NAVJEEVAN SF EXP · Superfast Bhusaval Jn (BSL) 07:45
    09:55 15648 GHY LTT EXPRESS · Mail/Express → arrives 13:35
    2 hr 10 min to change at BSL — comfortable130 min to change, which holds about 9 times in 10 here. Measured on 1,31,374 paired days.

Gudur Jn to Nasik Road by train

Is there a direct train from Gudur Jn to Nasik Road?
No. No single train runs from Gudur Jn to Nasik Road. The journey takes one change, at Jalgaon Jn, and the fastest combination takes 22 hr 42 min.
What is the fastest way from Gudur Jn to Nasik Road by train?
20625 MAS BGKT SF EXP departs Gudur Jn at 21:45 and reaches Jalgaon Jn at 16:47. 22537 KUSHINAGAR EXP then departs at 17:22 and arrives Nasik Road at 20:27. Total 22 hr 42 min, with 35 min to change.
Where do you change trains between Gudur Jn and Nasik Road?
Jalgaon Jn (JL) is the interchange on the fastest route, with 35 min between the arriving and departing trains.
Which days can you travel from Gudur Jn to Nasik Road?
A connection is available every day of the week.

Other trains from Gudur Jn

Other trains to Nasik Road

Important

RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.

RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.