Malkapur to Sattenapalle by train, with one change
No train runs the whole way from Malkapur to Sattenapalle. Changing at Vijayawada Jn takes 16 hr 52 min, and the quickest pairing is 12655 then 08551.
1 change · 650 km apart · fastest 16 hr 52 min · Daily
Check seats for your dateMalkapur (MKU) to Sattenapalle (SAP)Journeys and seats
- One change at Vijayawada JnBZA07:5516 hr 52 min00:47+1 arrives the next dayHolds 9 in 102 hr 5 min to change at BZA — tight
Holds about 9 times in 10 here. 138 min would make it 9 in 10. Measured on 3,39,430 paired days.
MKU — BZA
Checking seatsBZA — SAP
Checking seats - One change at Vijayawada JnBZA07:5517 hr 14 min01:09+1 arrives the next dayHolds 9 in 101 hr 35 min to change at BZA — tight
Holds about 9 times in 10 here. 138 min would make it 9 in 10. Measured on 3,39,430 paired days.
MKU — BZA
Checking seatsBZA — SAP
Checking seats - One change at Tenali JnTEL07:5517 hr 19 min01:14+1 arrives the next dayUsually holds1 hr 32 min to change at TEL
Typically 44 min late here, still leaving about 29 min to change.
12655 often runs late
MKU — TEL
Checking seatsTEL — SAP
Checking seats - One change at Secunderabad JnSC13:3517 hr 55 min07:30+1 arrives the next dayHolds 9 in 102 hr 6 min to change at SC
Holds about 9 times in 10 here. Measured on 14,101 paired days.
12719 often runs late
MKU — SC
Checking seatsSC — SAP
Checking seats - One change at Vijayawada JnBZA07:5518 hr 28 min02:23+1 arrives the next day
MKU — BZA
Checking seatsBZA — SAP
Checking seats - One change at Vijayawada JnBZA07:5518 hr 31 min02:26+1 arrives the next dayHolds 9 in 102 hr 35 min to change at BZA
Holds about 9 times in 10 here. Measured on 3,39,430 paired days.
17015 often runs late
MKU — BZA
Checking seatsBZA — SAP
Checking seats
Each leg is a separate ticket on its own PNR, booked separately. RAC is not a confirmed berth and a waitlist number is not a seat.
Malkapur to Sattenapalle by train
- Is there a direct train from Malkapur to Sattenapalle?
- No. No single train runs from Malkapur to Sattenapalle. The journey takes one change, at Vijayawada Jn, and the fastest combination takes 16 hr 52 min.
- What is the fastest way from Malkapur to Sattenapalle by train?
- 12655 NAVJEEVAN EXP departs Malkapur at 07:55 and reaches Vijayawada Jn at 21:35. 08551 VSKP CHZ SPL then departs at 23:40 and arrives Sattenapalle at 00:47. Total 16 hr 52 min, with 2 hr 5 min to change.
- Where do you change trains between Malkapur and Sattenapalle?
- Vijayawada Jn (BZA) is the interchange on the fastest route, with 2 hr 5 min between the arriving and departing trains.
- Which days can you travel from Malkapur to Sattenapalle?
- A connection is available every day of the week.
Other trains from Malkapur
Other trains to Sattenapalle
- Nalgonda to Sattenapalle34 direct trains · 129 km
- Secunderabad Jn to Sattenapalle22 direct trains · 239 km
- Charlapalli to Sattenapalle17 direct trains · 228 km
- Nellore to Sattenapalle15 direct trains · 291 km
- Samalkot Jn to Sattenapalle15 direct trains · 284 km
- Rajamundry to Sattenapalle15 direct trains · 234 km
RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.
RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.