Skip to search

New Bongaigaon to Rae Bareli Jn by train, with one change

No train runs the whole way from New Bongaigaon to Rae Bareli Jn. Changing at Prayagraj Jn takes 22 hr 40 min, and the quickest pairing is 12423 then 12539.

1 change · 927 km apart · fastest 22 hr 40 min · Daily

Check seats for your dateNew Bongaigaon (NBQ) to Rae Bareli Jn (RBL)

Journeys and seats

  • One change at Prayagraj JnPRYJ
    09:1022 hr 40 min07:50+1 arrives the next day
    12423RAJDHANI EXP09:1002:50Rajdhani
    2 hr 15 min to change at PRYJ — comfortable

    Holds about 9 times in 10 here. Measured on 99,265 paired days.

    12539YPR LKO EXP05:0507:50Superfast

    12539 often runs late

    NBQPRYJ

    Checking seats

    PRYJRBL

    Checking seats
  • One change at DanapurDNR
    14:5524 hr 13 min15:08+1 arrives the next day
    12505NORTHEAST EXP14:5505:56Superfast
    1 hr 37 min to change at DNR — comfortable

    Holds about 9 times in 10 here. Measured on 34,720 paired days.

    12355ARCHNA EXP07:3315:08Superfast

    12505 often runs late

    NBQDNR

    Checking seats

    DNRRBL

    Checking seats
  • One change at LucknowLKO
    08:1024 hr 51 min09:01+1 arrives the next day
    20505RAJDHANI EXP08:1005:45Rajdhani
    1 hr 50 min to change at LKO — tight

    Holds about 8 times in 10 here. 156 min would make it 9 in 10. Measured on 16,705 paired days.

    14210LKO PYGS INTRCT07:3509:01Mail/Express

    NBQLKO

    Checking seats

    LKORBL

    Checking seats
  • One change at LucknowLKO
    08:1024 hr 51 min09:01+1 arrives the next day
    20503RAJDHANI EXP08:1005:45Rajdhani
    1 hr 50 min to change at LKO — tight

    Holds about 8 times in 10 here. 156 min would make it 9 in 10. Measured on 16,705 paired days.

    14210LKO PYGS INTRCT07:3509:01Mail/Express

    20503 often runs late

    NBQLKO

    Checking seats

    LKORBL

    Checking seats
  • One change at LucknowLKO
    05:2025 hr 5 min06:25+1 arrives the next day
    22411ARUNACHAL EXP05:2004:00Superfast
    1 hr 10 min to change at LKO — tight

    Holds about 8 times in 10 here. 125 min would make it 9 in 10. Measured on 1,22,847 paired days.

    14242NAUCHANDI EXP05:1006:25Mail/Express

    22411 often runs late

    NBQLKO

    Checking seats

    LKORBL

    Checking seats
  • One change at Varanasi JnBSB
    08:1025 hr 23 min09:33+1 arrives the next day
    20503RAJDHANI EXP08:1001:30Rajdhani
    4 hr to change at BSB — comfortable

    Almost always holds here. Measured on 662 paired days.

    04623SVDK FESTIVL SPL05:3009:33Mail/Express

    04623 often runs late

    NBQBSB

    Checking seats

    BSBRBL

    Checking seats

Each leg is a separate ticket on its own PNR, booked separately. RAC is not a confirmed berth and a waitlist number is not a seat.

New Bongaigaon to Rae Bareli Jn by train

Is there a direct train from New Bongaigaon to Rae Bareli Jn?
No. No single train runs from New Bongaigaon to Rae Bareli Jn. The journey takes one change, at Prayagraj Jn, and the fastest combination takes 22 hr 40 min.
What is the fastest way from New Bongaigaon to Rae Bareli Jn by train?
12423 RAJDHANI EXP departs New Bongaigaon at 09:10 and reaches Prayagraj Jn at 02:50. 12539 YPR LKO EXP then departs at 05:05 and arrives Rae Bareli Jn at 07:50. Total 22 hr 40 min, with 2 hr 15 min to change.
Where do you change trains between New Bongaigaon and Rae Bareli Jn?
Prayagraj Jn (PRYJ) is the interchange on the fastest route, with 2 hr 15 min between the arriving and departing trains.
Which days can you travel from New Bongaigaon to Rae Bareli Jn?
A connection is available every day of the week.

Other trains from New Bongaigaon

Other trains to Rae Bareli Jn

Important

RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.

RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.