Skip to search

Rampur Hat to Nidadavolu Jn by train, with one change

No train runs the whole way from Rampur Hat to Nidadavolu Jn. Changing at Samalkot Jn takes 21 hr 43 min, and the quickest pairing is 22504 then 17015.

1 change · 1,029 km apart · fastest 21 hr 43 min · Daily

Check seats for your dateRampur Hat (RPH) to Nidadavolu Jn (NDD)

Journeys and seats

  • One change at Samalkot JnSLO
    22:2521 hr 43 min20:08+1 arrives the next day
    22504VIVEK EXPRESS22:2517:49Superfast
    1 hr 1 min to change at SLO — tight

    Holds about 8 times in 10 here. 142 min would make it 9 in 10. Measured on 91,494 paired days.

    17015VISAKHA EXPRESS18:5020:08Mail/Express

    22504 often runs late

    RPHSLO

    Checking seats

    SLONDD

    Checking seats
  • One change at DuvvadaDVD
    22:1221 hr 56 min20:08+1 arrives the next day
    02604GHY SC SPECIAL22:1216:28Mail/Express
    34 min to change at DVD — tight

    Typically 5 min late here, leaving about 10 min spare. It usually works, but there is little room.

    17015VISAKHA EXPRESS17:0220:08Mail/Express

    17015 often runs late

    RPHDVD

    Checking seats

    DVDNDD

    Checking seats
  • One change at Samalkot JnSLO
    22:2522 hr 24 min20:49+1 arrives the next day
    22504VIVEK EXPRESS22:2517:49Superfast
    1 hr 51 min to change at SLO — tight

    Holds about 9 times in 10 here. 142 min would make it 9 in 10. Measured on 91,494 paired days.

    12737GOUTAMI SF EXP19:4020:49Superfast

    22504 often runs late

    RPHSLO

    Checking seats

    SLONDD

    Checking seats
  • One change at Khurda Road JnKUR
    21:2722 hr 41 min20:08+1 arrives the next day
    12510GHY SMVB EXP21:2707:55Superfast
    1 hr 15 min to change at KUR — tight

    Holds about 8 times in 10 here. 120 min would make it 9 in 10. Measured on 1,40,239 paired days.

    17015VISAKHA EXPRESS09:1020:08Mail/Express

    12510 often runs late

    RPHKUR

    Checking seats

    KURNDD

    Checking seats
  • One change at Khurda Road JnKUR
    21:2722 hr 41 min20:08+1 arrives the next day
    12516SCL CBE EXPRESS21:2707:55Superfast
    1 hr 15 min to change at KUR — tight

    Holds about 8 times in 10 here. 120 min would make it 9 in 10. Measured on 1,40,239 paired days.

    17015VISAKHA EXPRESS09:1020:08Mail/Express

    12516 often runs late

    RPHKUR

    Checking seats

    KURNDD

    Checking seats
  • One change at Khurda Road JnKUR
    21:2722 hr 41 min20:08+1 arrives the next day
    12514SCL SC EXPRESS21:2707:55Superfast
    1 hr 15 min to change at KUR — tight

    Holds about 8 times in 10 here. 120 min would make it 9 in 10. Measured on 1,40,239 paired days.

    17015VISAKHA EXPRESS09:1020:08Mail/Express

    12514 often runs late

    RPHKUR

    Checking seats

    KURNDD

    Checking seats

Each leg is a separate ticket on its own PNR, booked separately. RAC is not a confirmed berth and a waitlist number is not a seat.

Rampur Hat to Nidadavolu Jn by train

Is there a direct train from Rampur Hat to Nidadavolu Jn?
No. No single train runs from Rampur Hat to Nidadavolu Jn. The journey takes one change, at Samalkot Jn, and the fastest combination takes 21 hr 43 min.
What is the fastest way from Rampur Hat to Nidadavolu Jn by train?
22504 VIVEK EXPRESS departs Rampur Hat at 22:25 and reaches Samalkot Jn at 17:49. 17015 VISAKHA EXPRESS then departs at 18:50 and arrives Nidadavolu Jn at 20:08. Total 21 hr 43 min, with 1 hr 1 min to change.
Where do you change trains between Rampur Hat and Nidadavolu Jn?
Samalkot Jn (SLO) is the interchange on the fastest route, with 1 hr 1 min between the arriving and departing trains.
Which days can you travel from Rampur Hat to Nidadavolu Jn?
A connection is available every day of the week.

Other trains from Rampur Hat

Other trains to Nidadavolu Jn

Important

RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.

RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.