Trains from Moradabad to Guwahati
6 direct trains · 1,694 km · fastest 28 hr 4 min on the 20504 DBRG RAJDHANI
Check live seats and faresMoradabad (MB) to Guwahati (GHY)Trains and seats
- Checking seats
- Checking seats
- Checking seats
- Checking seats
- Checking seats
- 20504DBRG RAJDHANI14:1128 hr 4 min18:15+1 arrives the next day
MB — GHY · 1,798 km · Rajdhani · fastest
Checking seats
RAC is not a confirmed berth and a waitlist number is not a seat. Fares are our estimate from the published tables, confirmed at IRCTC checkout — never a quote.
If the direct trains are full
3 ways to Guwahati with one change of train, on the date chosen above.
- One change at Katihar JnKIR14:1128 hr 59 min19:10+1 arrives the next day
55 min longer than the fastest direct
20506 DBRG RAJDHANI 14:11 — 08:35 on Thu and Sun
Holds 9 in 101 hr 10 min to change at KIR — tightHolds about 9 times in 10 here. 84 min would make it 9 in 10. Measured on 44,625 paired days.
20504 often runs late
MB — KIR
Checking seatsKIR — GHY
Checking seats - One change at New BongaigaonNBQ14:1131 hr 14 min21:25+1 arrives the next day
3 hr 10 min longer than the fastest direct
20506 DBRG RAJDHANI 14:11 — 15:25 on Thu and Sun
Usually holds1 hr 15 min to change at NBQTypically 18 min late here, still leaving about 39 min to change.
20504 often runs late
MB — NBQ
Checking seatsNBQ — GHY
Checking seats - One change at BareillyBE10:5531 hr 20 min18:15+1 arrives the next day
3 hr 16 min longer than the fastest direct
Holds 9 in 103 hr 11 min to change at BEHolds about 9 times in 10 here. Measured on 52,131 paired days.
15910 often runs late
MB — BE
Checking seatsBE — GHY
Checking seats
Each leg is a separate ticket on its own PNR, booked separately — and the second one is only worth buying once the first is confirmed.
Which of these arrives on time
The share of days each train has reached Guwahati within 15 minutes of its booked time, over the year to August 2026, from our delay history. 6 of 6 trains on this route have enough of a record to rank; the rest we have not tracked enough to say. A booked timetable is a promise — this is what has actually happened.
- 20504 DBRG RAJDHANIMost punctualtypically 24 min late at Guwahati31%
- typically 61 min late at Guwahati25%
- typically 143 min late at Guwahati22%
- typically 110 min late at Guwahati7%
- typically 145 min late at Guwahati5%
Runs late more often than not
- 15904 CDG DBRG EXP — arrives on time only 4% of the time, typically 172 min late
Fares
Estimated from the published tables for 1,694 km. The exact fare is the one IRCTC shows at checkout.
| Class | Fare | Basis |
|---|---|---|
| SL Sleeper | ₹725 | from observed fares |
| 3E AC 3 economy | ₹1,759 | from observed fares |
| 3A AC 3 tier | ₹1,874 | from observed fares |
| 2A AC 2 tier | ₹2,688 | from observed fares |
| 1A AC first class | ₹4,520 | from observed fares |
One adult, General quota, for the 1,694 km of this route, priced as a Mail/Express — the category 4 of the 6 trains above belong to. Which classes a particular train actually carries is not in our timetable, so this is what the distance costs in each class rather than a list of what is on any one train; the seat check below reads the real classes live. Every figure is an estimate confirmed at IRCTC checkout, never a quote, and flexi-fare trains are priced at the floor because occupancy pricing cannot be known before booking.
Other trains from Moradabad
Other trains to Guwahati
RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.
RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.