Skip to search

Bhabua Road to Daund Chord Lin by train, with one change

No direct train · 1 change at Dd Upadhyaya Jn · 1,194 km apart in a straight line · fastest 27 hr 48 min · Daily

Check this journey for your date

Journeys and seats

Each leg is a separate ticket

  • One change at Dd Upadhyaya JnDDU
    03:2527 hr 48 min07:13+1 arrives the next day
    12175Chambal Express03:25 — 04:43Superfast
    Holds 9 in 101 hr 7 min to change at DDU — tight

    Holds about 9 times in 10 here. 78 min would make it 9 in 10. Measured on 1,16,510 paired days.

    11428Jasidih–Pune Express05:50 — 07:13Mail/Express

    11428 often runs late

    BBU — DDU

    Checking seats

    DDU — DDCC

    Checking seats
  • One change at Dd Upadhyaya JnDDU
    02:5428 hr 19 min07:13+1 arrives the next day
    13307Gangasutlej Express02:54 — 04:20Mail/Express
    Holds 9 in 101 hr 30 min to change at DDU

    Holds about 9 times in 10 here. Measured on 1,16,510 paired days.

    11428Jasidih–Pune Express05:50 — 07:13Mail/Express

    11428 often runs late

    BBU — DDU

    Checking seats

    DDU — DDCC

    Checking seats
  • One change at Prayagraj JnPRYJ
    00:4228 hr 51 min05:33+1 arrives the next day
    12877New Delhi Garib Rath00:42 — 03:33Garib Rath
    Holds 9 in 103 hr 37 min to change at PRYJ

    Holds about 9 times in 10 here. This train arrives a median 94 min late, against 13 min late for the junction's typical arrival. Measured on 99,265 paired days.

    22132Gyan Ganga Express07:10 — 05:33Superfast

    11034 Darbhanga–Pune Express 07:10 — 05:33 on Sat

    12877 often runs late

    BBU — PRYJ

    Checking seats

    PRYJ — DDCC

    Checking seats
  • One change at Bhusaval JnBSL
    05:0628 hr 52 min09:58+1 arrives the next day
    18609Ranchi–Mumbai LTT Express05:06 — 00:05Mail/Express
    Holds 8 in 102 hr 20 min to change at BSL — tight

    Holds about 8 times in 10 here. This train arrives a median 92 min late, against 34 min late for the junction's typical arrival. 264 min would make it 9 in 10. Measured on 3,14,973 paired days.

    11026Amravati–Pune Express02:25 — 09:58Mail/Express

    18609 often runs late

    BBU — BSL

    Checking seats

    BSL — DDCC

    Checking seats
  • One change at Dd Upadhyaya JnDDU
    04:1628 hr 57 min09:13+1 arrives the next day
    15137Budh Purnima Express04:16 — 05:30Mail/Express
    Holds 9 in 101 hr 52 min to change at DDU

    Holds about 9 times in 10 here. Measured on 1,16,510 paired days.

    11432Amrit Bharat Express07:22 — 09:13Mail/Express

    15137 often runs late

    BBU — DDU

    Checking seats

    DDU — DDCC

    Checking seats
  • One change at Prayagraj JnPRYJ
    00:2229 hr 11 min05:33+1 arrives the next day
    03639Dhanbad–Shakurbasti Special00:22 — 06:00Mail/Express
    Holds 9 in 101 hr 10 min to change at PRYJ — tight

    Holds about 9 times in 10 here. 96 min would make it 9 in 10. Measured on 89,490 paired days.

    11034Darbhanga–Pune Express07:10 — 05:33Mail/Express

    03639 often runs late

    BBU — PRYJ

    Checking seats

    PRYJ — DDCC

    Checking seats
  • One change at Chalisgaon JnCSN
    08:5029 hr 30 min14:20+1 arrives the next day
    12321Mumbai Mail08:50 — 05:54Superfast
    Almost always holds2 hr 18 min to change at CSN

    Almost always holds here. Measured on 2,30,178 paired days.

    11078Jhelum Express08:12 — 14:20Mail/Express

    12321 often runs late

    BBU — CSN

    Checking seats

    CSN — DDCC

    Checking seats

Check this journey for your date

Bhabua Road to Daund Chord Lin by train

Is there a direct train from Bhabua Road to Daund Chord Lin?

No. No single train runs from Bhabua Road to Daund Chord Lin. The journey takes one change, at Dd Upadhyaya Jn, and the fastest combination takes 27 hr 48 min.

What is the fastest way from Bhabua Road to Daund Chord Lin by train?

12175 Chambal Express departs Bhabua Road at 03:25 and reaches Dd Upadhyaya Jn at 04:43. 11428 Jasidih–Pune Express then departs at 05:50 and arrives Daund Chord Lin at 07:13. Total 27 hr 48 min, with 1 hr 7 min to change.

Where do you change trains between Bhabua Road and Daund Chord Lin?

Dd Upadhyaya Jn (DDU) is the interchange on the fastest route, with 1 hr 7 min between the arriving and departing trains.

Which days can you travel from Bhabua Road to Daund Chord Lin?

A connection is available every day of the week.

Other trains from Bhabua Road

Other trains to Daund Chord Lin