Trains from Krishnarajapurm to Katni
3 direct trains · 2,066 km · fastest 33 hr 6 min on the 12295 SANGHAMITRA EXP
Check live seats and faresKrishnarajapurm (KJM) to Katni (KTE)Trains and seats
- 12295SANGHAMITRA EXP09:2933 hr 6 min18:35+1 arrives the next day
KJM — KTE · 2,066 km · Superfast · fastest
Checking seats - Checking seats
- Checking seats
RAC is not a confirmed berth and a waitlist number is not a seat. Fares are our estimate from the published tables, confirmed at IRCTC checkout — never a quote.
If the direct trains are full
4 ways to Katni with one change of train, on the date chosen above.
- One change at Perambur (Chennai)PER06:5131 hr 34 min14:25+1 arrives the next day
quicker than every direct train
Holds 9 in 101 hr 2 min to change at PERHolds about 9 times in 10 here. Measured on 2,44,659 paired days.
12608 often runs late
KJM — PER
Checking seatsPER — KTE
Checking seats - One change at Vijayawada JnBZA03:4532 hr 15 min12:00+1 arrives the next day
quicker than every direct train
Holds 8 in 101 hr 10 min to change at BZA — tightHolds about 8 times in 10 here. 120 min would make it 9 in 10. Measured on 2,39,567 paired days.
22501 often runs late
KJM — BZA
Checking seatsBZA — KTE
Checking seats - One change at Gudur JnGDR10:5533 hr 8 min20:03+1 arrives the next day
about as quick as the fastest direct
Holds 9 in 101 hr 37 min to change at GDR — tightHolds about 9 times in 10 here. 137 min would make it 9 in 10. Measured on 32,253 paired days.
12864 often runs late
KJM — GDR
Checking seatsGDR — KTE
Checking seats - One change at Vijayawada JnBZA10:5533 hr 50 min20:45+1 arrives the next day
44 min longer than the fastest direct
Holds 9 in 101 hr 55 min to change at BZA — tightHolds about 9 times in 10 here. 138 min would make it 9 in 10. Measured on 3,39,430 paired days.
12864 often runs late
KJM — BZA
Checking seatsBZA — KTE
Checking seats
Each leg is a separate ticket on its own PNR, booked separately — and the second one is only worth buying once the first is confirmed.
Which of these arrives on time
The share of days each train has reached Katni within 15 minutes of its booked time, over the year to September 2026, from our delay history. 3 of 3 trains on this route have enough of a record to rank; the rest we have not tracked enough to say. A booked timetable is a promise — this is what has actually happened.
- 22354 HUMSAFAR EXPMost punctualtypically 18 min late at Katni42%
- typically 31 min late at Katni25%
- typically 44 min late at Katni17%
Fares
Estimated from the published tables for 2,066 km. The exact fare is the one IRCTC shows at checkout.
| Class | Fare | Basis |
|---|---|---|
| SL Sleeper | ₹865 | from observed fares |
| 3E AC 3 economy | ₹2,069 | from observed fares |
| 3A AC 3 tier | ₹2,179 | from observed fares |
| 2A AC 2 tier | ₹3,108 | from observed fares |
| 1A AC first class | ₹5,234 | from observed fares |
One adult, General quota, for the 2,066 km of this route, priced as a Superfast — the category 3 of the 3 trains above belong to. Which classes a particular train actually carries is not in our timetable, so this is what the distance costs in each class rather than a list of what is on any one train; the seat check below reads the real classes live. Every figure is an estimate confirmed at IRCTC checkout, never a quote, and flexi-fare trains are priced at the floor because occupancy pricing cannot be known before booking.
Other trains from Krishnarajapurm
- Krishnarajapurm to Katpadi Jn38 direct trains · 217 km
- Krishnarajapurm to Jolarpettai38 direct trains · 134 km
- Krishnarajapurm to Vijayawada Jn23 direct trains · 734 km
- Krishnarajapurm to Perambur (Chennai)21 direct trains · 341 km
- Krishnarajapurm to Arakkonam20 direct trains · 278 km
- Krishnarajapurm to Salem Jn18 direct trains · 254 km
Other trains to Katni
RailRoute is an independent service. It is not affiliated with, endorsed by, or operated by Indian Railways, IRCTC, or any Government of India entity. Train names and station codes are used for identification only.
RailRoute does not sell tickets and never takes a payment. Fares are estimates and seat availability changes continuously; the exact fare and the actual booking are confirmed on IRCTC.